StraightWatt

All states / Florida

Solar in Florida

At 15.1¢ per kWh and 1544 kWh of production per kW each year, a household paying $200 a month needs a 9.68 kW system. Paid in cash, it returns its $20,514 cost in 8.9 yr.

What we don't know yet

warnNet metering rule for FL not yet verified against the tariff.
warnState incentives for FL not yet researched - net cost may be overstated.

Two prices, two answers

Payback 8.9 yr — at competitive quoted prices ($2.12/W, EnergySage 2026): net cost $20,514, 25-year net $46,082.

Payback 17.9 yr — at typical reported prices ($4.50/W, LBNL 2023): net cost $43,544, 25-year net $23,052.

The gap is methodology, not staleness: the first what you get if you shop around for competitive quotes; the second what the average buyer actually paid, as recorded in permit and incentive data. Every table below uses quoted prices. Why we show both.

By monthly bill

Your billUse / yrSystemPanelsNet costPayback25-yr net (cash)Lease, year 1
$100/mo6,993 kWh4.53 kW12$9,6029.6 yr$18,618$317
$150/mo10,967 kWh7.1 kW18$15,0589.1 yr$32,350$497
$200/mo14,940 kWh9.68 kW25$20,5148.9 yr$46,082$677
$300/mo22,887 kWh14.82 kW38$31,4268.8 yr$73,544$1,037

Cash, loan or lease — at $200 a month

How you pay25-year netUpfrontYear 1Payback / cash flowFederal credit to you
Cash$46,082$20,514$2,1068.9 yr$0
Loan
$159/mo · 6.99% APR · 20 yr
$28,455$0$199cash-flow neutral from year 1 (+$199/yr)$0
Lease / PPA$18,997$0$677immediate (+$677 in year 1)$0

The 30% federal credit goes to the system owner, not to you. It is reflected in the rate you are offered. The owner claims it at 30% under IRC 48E.

The inputs, and where they came from

InputValueSource
Residential electricity rate15.1¢/kWhU.S. EIA API v2, electricity/retail-sales, residential sector, 2026-06
Specific yield1544 kWh/kW/yrNLR (formerly NREL) PVWatts v8 API, 1 kW reference system (city:orlando-fl)
Installed cost$2.12/WEnergySage Marketplace real-quote average, as of Sep 2026; page updated 2026-08-28 · LBNL Tracking the Sun 2023 median: $4.5/W, reference only
Export compensationfull retail net metering · 100%Full retail net metering — not yet verified against the tariff
Federal credit, purchase0%IRC 25D (expired)
Federal credit, third-party owner30%IRC 48E (Clean Electricity Investment Credit)
State incentives$0Not yet researched — net cost may be overstated

City-level production on file for: Orlando. The figures above use Orlando.

Adjust it for your bill